Project Status
Delivered on time 12 / 2024
Scope of work
structural design review, structural reinforcement redesign, Mechanical design, electrical design, firefighting and fire life safety design, irrigation desing, water and sewage treatment design
Description/Built up area
Total built up area: 12000 m2
Landscaping area: 140000m2
