Project Status
Shop drawings packages: completed 09/2018
Construction: phase 1 completed 09/2020 / phase 2 on hold
Scope of work
Structural concrete and steel shop drawings, As built drawings
Description/Built up area
7 Residential buildings consisting of 4 basements + GF + 3 Floors / 16000m2